*Corresponding author:
EN Bereslavskii, St. Petersburg State of Civil Aviation Univerity, 38, Pilots street, St. Petersburg, Russian FederationReceived: May 25, 2018; Published: May 30, 2018
DOI: 10.26717/BJSTR.2018.05.001145
To view the Full Article Peer-reviewed Article PDF
In Figure 1 the rectangular crossing point with slopes of AA1 and DB on the impenetrable horizontal basis of length of L is presented. Water height in the top tail of Н, lower tail with water level of Н2, having partially impenetrable vertical wall CD (screen), adjoins a layer sole. If the working part of the crossing point CB (filter) of width of H1 is flooded, H2>H1, an interval of seepage, usual for dams, is absent. The upper bound of area of the movement is the free surface of AD, coming to the disproportionate CD, screen to which there is a uniform evaporation of intensity ε (0 < ε < 1).